Tuzla Dalsan Shipyard Port Dredging Group Marine Construction Transport Dumping Work Shipyard Services References Machine And Equipments

Marine Construction
As a result of evolving technological achievements; old construction techniques are replaced to precast elements which are safer, faster, more economical and most importantly do not require maintenance after construction like concrete piles which have a radius upto 1.4 m and 40 m length, be produced monolithic and superimposable, consists of special reinforced chemical prestressed concrete, caissons that are formed of modular produced floatable concrete units which are consist of empty cellulars and dimensions change depending upon the depth water, L-wall and T-wall.

Warning: include(footer.php): failed to open stream: No such file or directory in /home/dlsn/domains/dalsangrup.com/public_html/eng/deniz_yapilari.php on line 26

Warning: include(): Failed opening 'footer.php' for inclusion (include_path='.:/usr/local/php72/lib/php') in /home/dlsn/domains/dalsangrup.com/public_html/eng/deniz_yapilari.php on line 26